Verkleidung Stahl montieren Scotty Duo
Fig. 23: Mounting the hopper trough
2
3
Fig. 24: Attaching the nuts and silicon metal
buffer
1
2
2
Fig. 25: Mounting convection lamella right
1
Fig. 26: Attaching cover
26) Mount the hopper trough (1) and fasten with the two
27) Attach silicon metal buffer (3) (M6/SW10) and align
28) Check the functioning of the hopper lid switch (aud-
1
29) Hopper trough (1) should be aligned with the base.
30) Mounting convection lamella right (1).
31) Tighten the four nuts (2) (M6/SW10).
2
2
32) Attach top cover (1) and fasten the two screws (2)
2
2
EN
nuts (2) (M5/SW8).
the hopper cover.
ible click sound when opening/closing).
(TX25).
1 | General
29