Installation Requirements; Tools And Parts - Jenn-Air JVR0430HS Instructions D'installation Et Guide D'utilisation Et D'entretien

Hotte de cuisinière pour montage mural 30" (76,2 cm) et 36" (91,4 cm)
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Tools and Parts

Gather the required tools and parts before starting installation.
Read and follow the instructions provided with any tools
listed here.
Tools needed:
Level
Drill with 1
/
" (3.0 cm),
1
3
4
bits
Pencil
Tape measure or ruler
Adhesive tape
Flat-blade screwdriver
Metal snips
Phillips screwdriver
T20
Torx
bit or driver
®
®
Parts needed:
Part Name
Qty.
Duct as per ceiling
1
height;
external diameter
6" (15.2 cm)
Steel duct clamps for
2
6" (15.2 cm) ducts
Parts supplied:
Remove parts from packages. Check that all parts are included.
Part Name
Qty.
Hood canopy
1
assembly with
ventilator and lights
installed
Chimney covers
2
Charcoal filter
1
mounting bracket
Charcoal filter
1

INSTALLATION REQUIREMENTS

/
" (5.0 mm) and
/
" (8.0 mm) drill
6
16
19
Part Name
Charcoal filter
clamps
Plastic transition
Paper template
3 prong plug with
connector
Wire clamp
Ø5 x 45 mm screws
Ø8 x 40 mm anchors
3.5 x 9.5 mm screws
2.9 x 6.5 mm pins
Flat washers
Qty.
3
1
1
1
1
8
8
6
2
3
5

Publicité

Table des Matières
loading

Table des Matières