Télécharger Imprimer la page

Klarstein ROYAL FLUSH ECO Mode D'emploi page 43

Masquer les pouces Voir aussi pour ROYAL FLUSH ECO:

Publicité

Installation:
Drill 585*93 holes above the installa-
tion cabinet according to the outline
size of the flue. Note: The holes for the
cabinet installation should be drilled
according to the size of the drawing.
Siehe ➀ ➀
Siehe
Siehe ➁ ➁
Siehe
1. Once the housing is in the
1. Once the housing is in the
correct position, use 4 ST 4.0x8
correct position, use 4 ST 4.0x8
self-tapping screws to secure the
self-tapping screws to secure the
housing.
housing.
2. The bottom side is secured with
2. The bottom side is secured with
two ST 4x30 self-tapping screws
two ST 4x30 self-tapping screws
(for cement floors, an expansion
(for cement floors, an expansion
rubber plug must be added).
rubber plug must be added).
Provide the worktop with a cut-out
for the cooktop.
Siehe ➀ ➀
Siehe
1. Attach the bellows to the hous-
1. Attach the bellows to the hous-
ing using D1.0030 ST 4.0x8 screws.
ing using D1.0030 ST 4.0x8 screws.
2. 4 holes must be drilled for the
2. 4 holes must be drilled for the
screws.
screws.
Siehe ➁ ➁
Siehe
The installation is now
complete.
EN
43

Publicité

loading