Télécharger Imprimer la page

VEVOR Z1Z-CF-9150 Mode D'emploi page 15

Publicité

4. The use of leakage protection switch:
A) Plug into receptacle.
B) Press"RESET"button:indicator should be "ON".
C) Press "TEST"button:indicator should be "off ".
D) Press"RESET"button for use,do not use if "TEST" fails.
E) No overload protection.
DO NOT USE IF TEST FAILS!
5. Fixed workpiece: The workpiece being drilled should be firmly fixed to prevent it from
shaking or moving.
6. Correct operating posture: Maintain body balance and firmly hold the drilling machine
with both hands.
7. Control drilling speed: Avoid pushing too fast to prevent machine overload or accidents.
8. Follow the operating procedures: strictly follow the instructions and relevant safety
regulations of the drilling machine for operation.
1. How to install the drill
Before operating, fix the base on the work piece reliably and tightly, fasten it with expansion
bolts, then fastening 4 bolts on the base uniformly, in the end, tightening them with the
nuts.
2. Check the voltage:
Make sure the voltage is the same as that indicated on the board of the tools, the voltage in
the circuits should be kept at +/-5%.
3. How to install bit:
Installing the diamond-thin bit carefully, the end thread shall match with the end output
HANDLING INSTRUCTIONS
13

Publicité

loading