Télécharger Imprimer la page

VEVOR Z1Z-CF-9150 Mode D'emploi page 12

Publicité

12. The maximum permitted pressure of the liquid supply is 0.12MPa.
13. Never to use the tool without the RCD provided.
14. You have to test the correct operation of the RCD before starting work: the
red light will be on after pressing the button "RESET"; and the light will be off after
pressing the button "TEST"; You can only to operate the tool when the RCD can
work correctly.
15. Replacement of the plug or the supply cord shall always be carried out by the
manufacturer of the tool or his service organization.
16. Keep liquid clear off the parts of the tool and away from persons in the
working area in order that the water can not enter into the electronic equipment of
the tool and keep your safety. It must be use catchment set when the machine
working with elevation.
SAVE THESE INSTRUCTIONS
Model
Style
Input
Power
No – load speed
Max. Hollow Drilling
Output shaft
Water inlet connection
MODEL AND PARAMETERS
US(AC120V 60Hz) / EUR(AC230V 50Hz)
10
Z1Z-CF-9150
Portable
1500W (Note: Max. 2000W)
0-1800r/min
Φ20-Φ160mm(Brick wall)
Male thread: UNC1 1/4-7
Outside diameter: Φ9.2mm

Publicité

loading