Télécharger Imprimer la page

Topaz LWRAPA2-25PCS Instructions D'installation page 3

Publicité

Item:
LWRAPA2-25PCS
LWRAPA4-50PCS
LWRAPA2-25PCS-EM
LWRAPA4-50PCS-EM
LWRAPA-OS-PIR-BT
INSTALLATION INSTRUCTIONS
Junction Box Mounting Instructions:
Junction
Box
Figure 4
Figure 5
Figure 6
Keyhole Mounting Instructions:
Figure 7
©2023 Southwire Company, LLC. All rights reserved.*Registered Trademark & Trademark of Southwire Company, LLC.
ARCHITECTURAL WRAP
Junction Box Screws
Punch through knockout
800-666-2852 | SOUTHWIRE.COM
1. Adjust the 2 screws from the junction box to stick out about
1/4" to mount the fixture base in later steps. See Figure 4.
2. Punch through the center knockout and pull the black white
and green wires through.
Note: Wiring connections can be made inside the fixture or inside
of the junction box (shown in Figure 5).
3. Make wiring connections shown in the Wiring Diagram.
4. Attach the fixture base to the junction box by aligning the
holes on the fixture base with the small Philips Head screws on
the junction box.
5. Turn the fixture base clockwise to secure the fixture in place.
Tighten the small Philips Head screws and make sure the
fixture does not move. See Figure 6.
Align the fixture base in the desired location on the ceiling. Mark
the 4 keyhole locations.
WALL STUD MOUNTING
1. Place the fixture aside. If the mounting holes go through wall
studs, drill a pilot hole in each of the markings using a 5/32" drill
bit (Not Included).
2. Install the 4 large Philips Head wood screws into the pilot holes.
Be sure not to tighten the screws all the way down. Leave each
screw head out about 1/4". See Figure 7. Skip to step 6.

Publicité

loading

Ce manuel est également adapté pour:

Lwrapa4-50pcsLwrapa2-25pcs-emLwrapa4-50pcs-emLwrapa-os-pir-bt