Télécharger Imprimer la page

Maiko PPB 30 O Notice De Montage page 37

Publicité

RLS 45 K room air control is used to activate
PPB 30 O or PPB 30 K units.
1. Take off frame of room air control.
2. Connect PPB 30 O to the RLS 45's FAN1
and FAN 2 connection terminals. Connect
PPB 30 K units to RS 485 bus.
The power supply to the PPB 30 K
i
(+) MUST come from the Fan1 or
Fan2 connection. Connect accord-
ing to wiring diagram ( Appendix).
A combination of PPB30 O and PP 45
i
units is not permitted at the FAN1 and
FAN2 connection terminals of the RLS
control.
No exhaust air function is possible
i
for PPB 30 O units on an RLS 45 K
control.
If a PPB 30 K unit is running in exhaust
i
air mode, the PP 45/PPB 30 O units
handle the volumetric flow compensa-
tion at the fan interface (Fan1/Fan2). It
is important that the unit type + quantity
are set correctly.
3. Insert room air control in the recessed-
mounted box and screw down to re-
cessed-mounted box with 2 screws.
4. Fit frame. Ensure that the sensor opening
is above the PP 45 HYI (if fitted) and that
the frame engages.
5. Start up ventilation system  Chapter 10.
9.8 Installing PP 45 HYI humidity sensor
in
RLS 45 O or RLS 45 K
1. Install room air control as described in
Chapter 9.7.
NOTICE
Unit damage/no function if the humidity
sensor is installed incorrectly. Do not bend
pins. Insert sensor up to stop in bush.
2. Insert PP 45 HY humidity sensor at I2C
interface Arrow.
3. Fit frame so that it engages.
Ensure that sensor opening (hole in
i
frame) is above the PP 45 HYI sensor.
4. Start up ventilation system and register
humidity sensor in service mode  Chap-
ter 10.
5. For installation and wiring of an external
sensor  Commissioning instructions.
9 Mounting | UK
37

Publicité

loading

Ce manuel est également adapté pour:

Ppb 30 kRls 45 oRls 45 k