Télécharger Imprimer la page

EuroLite TS-8 Mode D'emploi page 23

Publicité

Procedure:
The device should be installed outside areas where persons may walk by or be seated.
IMPORTANT! OVERHEAD RIGGING REQUIRES EXTENSIVE EXPERIENCE, including (but not limited to)
calculating working load limits, installation material being used, and periodic safety inspection of all
installation material and the device. If you lack these qualifications, do not attempt the installation yourself,
but instead use a professional structural rigger. Improper installation can result in bodily injury and or
damage to property.
The device has to be installed out of the reach of people.
If the device shall be lowered from the ceiling or high joists, professional trussing systems have to be used.
The device must never be fixed swinging freely in the room.
Caution: Devices in hanging installations may cause severe injuries when crashing down! If you have
doubts concerning the safety of a possible installation, do NOT install the device!
Before rigging make sure that the installation area can hold a minimum point load of 10 times the device's
weight.
When installing the device, make sure there is no highly-inflammable
material (decoration articles, etc.) within a distance of min. 0.5 m.
Mount the device to your trussing system using an appropriate clamp.
For overhead use, always install a safety-rope that can hold at least 12 times the weight of the fixture. You
must only use safety-ropes with quick links with screw cap. Lead the safety-rope through the mounting-
bracket of the device and over the trussing system or a safe fixation spot. Insert the end in the quick link and
tighten the safety screw.
The maximum drop distance must never exceed 20 cm.
A safety rope which already hold the strain of a crash or which is defective must not be used again.
Adjust the desired inclination-angle via the mounting-bracket and tighten the fixation screws.
Before taking into operation for the first time, the installation has to be approved by an expert!
Master/Slave-operation
The master/slave-operation enables that several devices can be synchronized and controlled by one master-
device.
On the rear panel of the TS-8 you can find an XLR-jack (DMX Out) and an XLR-plug (DMX In), which can be
used for connecting several devices.
Choose the device which is to control the effects. This device then works as master-device and controls all
other slave-devices, which are to be connected to the master-device via a balanced microphone lead.
Connect the DMX OUT-jack with the DMX IN-plug of the next device.
Set DIP-switch No. 10 to On for the master-device. Set DIP-switch No. 1 to On for all slave-devices.
Occupation of the DIP-switches:
DANGER OF FIRE!
DANGER TO LIFE!
23/54
51785815_V_1_0.DOC

Publicité

loading