Télécharger Imprimer la page

Sunfire SF150 Manuel D'utilisation page 9

Publicité

Les langues disponibles

Les langues disponibles

RADIANT HEATER OPERATION
Following is an outline of the Radiant Heater basic operation process:
Keep unit on a level, non-combustible surface at all times. If the unit is sitting on a 25° angle or
more the tip switch will turn the heater off and/or prevent the heater from starting.
1. Fill tank with Diesel or #2 Fuel Oil only.
2. Plug into a grounded outlet or extension cord.
3. Switch to HIGH fire.
4. Turn the power switch ON.
5. The blower will come on and run for 15 seconds prior to lighting (pre-purge).
6. After a few seconds the green light will come on letting the user know it is calling for heat
and will fire within a few seconds.
7. When shutting down the heater, turn the power switch to OFF. Allow the burner to complete the
cool down cycle (post-purge), which takes about 5 minutes, before disconnecting power.
WARNING: Allow the heater to complete its post-purge cycle to remove heat and fuel vapors
to reduce the risk of a fire hazard or damaging components.
Generators: The SunFire 150 can operate using a generator or with a 12V Pure Sine Power Inverter
(800W minimum). If generator has not been used for an extended period, it is recommended to run for
20 minutes to recharge the capacitor before operating the heater. Otherwise, there may not be sufficient
voltage and the heater may not start or may shut off prematurely after running briefly.
WARNING: DO NOT OPERATE RADIANT HEATER WITHOUT THE BURNER COVER
SECURELY ATTACHED.
THERMOSTAT INSTALLATION INSTRUCTIONS
REQUIRED PARTS
Qty
1
1
1
Desired Length
Two bullet connectors are already included in the same packet that contained this service manual.
TYPE OF THERMOSTAT
The SunFire 150 does not require an authorized or specific thermostat to regulate the
temperature. A simple wall thermostat is all that is necessary. The only requirement is that the
thermostat cannot be powered from the heater, as it will damage the primary control. Please
use a basic manual or battery-operated thermostat.
User's Manual: Radiant Heater
Part
Female Bullet Connector (18 Gauge)
Male Bullet Connector (18 Gauge)
Wall Thermostat
18 Gauge CU CL2 Thermostat Wire
2-2
Included
Included
Not Included
Not Included

Publicité

loading

Produits Connexes pour Sunfire SF150

Ce manuel est également adapté pour:

Sf-150150