Télécharger Imprimer la page

Annovi Reverberi RK 11.14 N Notice D'utilisation Et Installation page 38

Publicité

Les langues disponibles
  • FR

Les langues disponibles

MAINTENANCE INSTRUCTIONS
7
Lengthy pump lay-offs
If the pump is to be unused for a long time, proceed as described below.
1) Run the pump with clean water for a few minutes.
2) Operate the pump without water for 10 seconds with the end of the delivery pipeline open to empty the
pump and the delivery circuit and prevent scaling.
3) Flush the pump with water and solvents authorised by the relevant laws.
4) Dry the pump with a pressurised air jet.
5) Protect the pump from weather.
Putting the pump back into service
Before putting the pump back into service after a long period out of use, check the oil level and the tightness
of the mounting screws.
Scrapping the pump
The pump must be scrapped by skilled staff, in compliance with the statutory requirements on occupational
safety.
The dismantled components must be sorted by the type of materials from which they are made. Do not dump
pollutants such as seals and lubricants in the environment.
Dispose of them in accordance with statutory requirements with regard to waste disposal and recycling.
English
Use and Installation
38

Publicité

loading