Starting and stopping the pump when supplied by an auxiliary pump
To start the pump, proceed as described below.
1) Open the shut-off valve (J).
2) Open
the
by-pass
depressurise the delivery pipeline.
3) Start the auxiliary pump (C).
4) Start the pump (D) and run it for a few
minutes with no pressure.
5) Adjust the by-pass valve (G) to obtain
the pump's operating pressure.
To stop the pump, proceed as described
below.
1) Open the by-pass valve (G) to discharge
the pressure.
2) Stop the pump (D).
3) Stop the auxiliary pump (C).
4) Close the shut-off valve (J).
English
INSTRUCTIONS FOR USE
valve
(G)
to
UN003406-CV
34
6
Use and Installation