Télécharger Imprimer la page

probst RG-20/80 Instructions D'emploi page 43

Masquer les pouces Voir aussi pour RG-20/80:

Publicité

Les langues disponibles

Les langues disponibles

Operation
6
Operation
6.1
Device operation
Connect the device with the suspension bolt to the lifting equipment/carrier (e.g. with crane hook).
Adjust the gripping range and the height support.
Lower the device on the gripping good (concrete tube) until the automatic release unlocks, when
the device is lifted.
Lifting up the device will close and you can lift the gripping good (concrete tube).
Transport the device and the gripping good (concrete tube) to the destination place.
Lowering the device the automatic release will lock and the device can be lift without the
gripping good (concrete tube).
The gripping goods (concrete pipes) must
always be gripped below the largest pipe
diameter,, otherwise exists a danger of
slipping off!!
DANGER OF LIFE !!!
54500002
15 / 21
GB

Publicité

loading