OPERATING INSTRUCTIONS

Commissioning

6

Decommissioning

Preparing for operation

6.1
For commissioning fill the pump with operating
liquid up to middle of shaft. This may be ef-
fected through suction, discharge or operating
liquid pipe.
CAUTION
Dry run of the pump shall be avoided by all
means. Otherwise any warranty for any
consequences resulting including claims
for compensation of damages invalidate.
Check the direction of rotation. Wrong
direction of rotation leads to damages at
the pump.
V1/V6/V30/V55
In order to control the liquid level N, an addi-
tional valve in the operation liquid pipe may be
provided (see illustr. 4b).
V95 - 430
In order to control the liquid level N a valve
may be connected to the connection U
automatic discharge valve at this connection
controls and regulates the liquid level auto-
matically (illustr. 2a/4a).
Commissioning
6.2
Switch-on motor, open shut-off valve V
resp. V
.
K
When starting operation with closed suc-
tion side, open the ventilation device be-
fore and close it after having reached the
operating speed.

Adjustment of flow volume

6.3
6.3.1
Open circulation cooling according
to illustration 2a
Open shut-off valve V
running and adjust regulating valve r
pressure at mano-vacuum meter m
(max. 0,2 bar). Block-up the regulating valve r
in this position. Maximum temperature of
operating liquid see 1.1. Then the vacuum
pump draws the quantity of clean water as
indicated in diagram 1.
. An
V
F
while the pump is
F
that the
F,
is ca. 0 bar
B
F
6.3.2
Closed circulation cooling accord-
ing to illustration 3
While the vacuum pump is running adjust the
regulating valve r
vacuum meter m
B
bar from compression pressure.
The flux of cooling liquid K will be adjusted
through the regulating valve r
device. The regulating valves are to be
blocked.
6.3.3
Continuous cooling according to
illustration 4a
Open shut-off valve V
running and adjust regulating valve r
pressure at mano-vacuum meter m
(max. 0,2 bar). Then the vacuum pump draws
the quantity of clean water, as indicated in
diagram 1a.
6.3.4
For automatic systems according to
illustration 2b
The required temperature of operating liquid
has to be adjusted at the thermostatic regulat-
ing valve r
The pressure reducing regulator
F2
.
r
will be adjusted that the pressure at mano-
F3
vacuum meter m
B
0 bar.
Decommissioning
6.4
Close shut-off device V
motor, possibly open ventilation device h.
If the decommissioning is made to effect
any works at the pump, the drive must be
secured so that it cannot be switched on.
When using the pump for hazardous gases, it
has to be rinsed thoroughly before opening. In
order to prevent that easily inflammable gases
will cause an explosive air/gas mixture, the
pump has to be rinsed sufficiently with inert
gas before opening it and before restarting it
after opening.
In case of danger of frost or danger of congeal-
ing of the ring liquid, pump and liquid separator
have to be emptied by withdrawing all plugs at
bottom. This is also applicable for a longer
shut-down period.
23
that the pressure at mano-
F
,
is differing no more than -0,2
at open shut-off
K
while the pump is
F
that the
F
,
is ca. 0 bar
B
will not exceed considerably
resp. V
, switch-off
F
K