Télécharger Imprimer la page

Thermor BILBAO 4 Notice D'installation Et D'utilisation page 51

Publicité

Les langues disponibles

Les langues disponibles

Obtain suitable plugs and screws for your type of wall, with
a minimum load capacity of 40 kg per mounting point (screws and plugs
not supplied).
Place the bracket
on the floor and
against the wall.
Refit the wall bracket by aligning it with
the drilling points A to locate the other
drilling points B.
The other drilling points B indicate
the position of the upper mountings.
Drill the 4 holes and insert plugs.
Use suitable plugs for your type of wall.
Position the wall bracket and screw it in.
MOUNTING THE WALL BRACKETS
MOUNTING THE WALL BRACKETS
HORIZONTAL AND LOW MODELS
HORIZONTAL AND LOW MODELS
Locate the drilling
points A.
The drilling points A
indicate the position
of the upper mountings.
46
Drilling
points A
Drilling
points B
Drilling
points A

Publicité

loading