4
1
2
8
Fig. 1
4
3
2
1
Fig. 2
2
1
Fig. 3
11.08/WE
DESCRIPTION
4
3
5
6
7
9
3
4
4.1 CONSTRUCTION
1 Operating panel
2 Strap tensioning push button
3 Handle
4 Battery
5 Rocker lever
6 Welding/cutting button
7 Welding/Cutting
8 Tensioning
9 Battery charger (refer to chapter 4.4)
Note on performance
In order to achieve peak performance, only
original batteries and charger may be used.
4.2 OPERATING PANEL
1 Welding time push button
2 Strap tension push button
3 Battery push button
4 LED-indicators 1–7
5
Green
= Strap tension setting
Red
= Battery empty indicator
5 Setting – push button
6 Setting + push button
6
For detailed information of the operating
panel, refer to chapter 6.3.
– Clamping of the straps by tooth plate on rocker
(3/1).
– Tensioning by feed wheel (3/2) anti-clockwise.
– Friction welding (3/3) of the straps.
– Upper strap is cut by knife (3/4).
ORGAPACK OR-T 300
4.3 FUNCTION
17