Télécharger Imprimer la page

Mediclinics M14ACS Manuel D'installation Et D'utilisation page 13

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 18
After fitting the metal plate, the hand dryer should be hung on it. The lower screw fits safely the
appliance to the wall. So, to assemble the hand dryer the following steps must be done:
Make five 8 mm (0.31") diameter drill holes in the wall using the provided template (1).
Clean the dust away and insert the wall plugs.
Screw the upper plate to the wall (2).
Plastic covers which protect the terminal block (inlet power supply) must be removed (3).
The hand dryer should be hung on the metal support which has been fitted to the wall (4).
Pass the electrical cables from mains through the 22 mm diameter hole located in the rear
plastic base3 plate. (5).
Connect the electrical wires to the hand dryer terminal block.
Two phases (N,L) and earth wires must be screwed in the right ways of the terminal block,
as indicated by the engraved letters (6).
After this operation has been done, plastic covers must be placed correctly (10).
Remove the air inlet filter casing (7).
Firmly place the lower screw for fixing the appliance completely (8).
Put the inlet air casing to its location (9).
Figure 2
-13-
www.mediclinics.com

Publicité

loading

Ce manuel est également adapté pour:

M14aM14ab