Télécharger Imprimer la page

Elem Garden Technic FBHT65-22TCH Traduction Des Instructions D'origine page 76

Publicité

Les langues disponibles

Les langues disponibles

Open Shipping Crate
1) Set the shipping Crate on a solid, flat surface.
2) Carefully cut the shipping bands and remove lid of shipping crate.
3) Using two people to lift, carefully remove the engine, oil tank, wheels, tow bar, support
legs, and hardware. (For parts reference see page22-24 in manual)
4) Leave the hydraulic cylinder/log cradle in the shipping crate until step 6 in the
assembly process.
5) Locate all hardware before beginning assembly.
Step 1: Wheel Assembly
Fix the wheel (#51) to the oil tank (#39) axle by
a flat washer Ø20 (#25), slotted nut M20(#88),
cotter pin Ø4x36 (#52) and attach the axle cap
(#101).
Step 3: Attach Tow bar to Oil Tank
Fix the tow bar (#39), to the oil tank by using 4
sets of hex bolt M12x40 (#31), flat washer Ø12
(#3) and lock nut M12 (#67).
ASSEMBLY
Step 2: Attach Tow bar and Support
Leg
Fix the support leg (#62) to the tow bar
(#30) by a pin (#42) and handle wheel
(#83).
Step 4: Assemble Rear Support
Leg
Fix the rear support (#34) to the tow bar by
using hex bolt M10x75 (#36), lock nut M10
(#32), flat washer Ø10(#97). Slide in hitch
pin (#35) and secure with R pinØ3x55
(#26).
76

Publicité

loading