FINALIZING INSTALLATION OF
THE FRAME IN THE CABINET
STEP 1
Attach the telescopic foot to the
lower stud mount using the #8-32 x
1/2" machine screws and flat washers
provided, making sure not to tighten at
this time. Lay flush to the floor of the
cabinet (See Figure 1). Once the foot
is in full contact with the floor of the
cabinet, tighten the machine screws from
the previous step.
Now attach the foot to the floor of the
cabinet using (2) #8 x 5/8 deep thread
screws provided (See Figure 2).
NOTE: Make sure the foot and stud
mount are perpendicular to the floor
of the cabinet and do not lean left or
right (this will cause interference with
the gas spring that operates the waste
container).
ATTACHING THE DOOR
STEP 2
Use separate door mount worksheet to
attach product to the door.
TESTING FUNCTIONALITY
STEP 3
During the first 5-10 cycles extend the
frame to the fully open and fully closed
positions assisting the entire length of
travel. At this point the unit should open/
close itself for the last 6-8" of travel.
NOTE: If the unit is not opening/closing
fully or not operating smoothly check
the following:
Make sure that the installation of the front
and rear brackets allow the slides to be
"square" without binding by measuring
corner to corner on the slides with the
unit in the open position.
Check that the slides are both level front
to back and that they are also level from
one slide to the next (laying a level across
both slides when waste container is in the
open position).
Check that the bottom foot is vertical
front to back and left to right.
8
#2
Customer Service: 800-626-1126 | rev-a-shelf.com
FIGURE 1
FIGURE 2
12400 Earl Jones Way
Louisville, KY 40299
rev-a-shelf.com
Customer Service: 800-626-1126