ATTACHING THE SLIDES TO
THE CABINET
STEP 6
While supporting the front of the side
mounting bracket, engage the back of
the slide with the rear strap assembly
by sliding it into the outer socket of the
assembly. The product member should
be pushed into the rear strap assembly
until the front of each product member
and each side-mounting bracket is flush
with the front of the face frame. This is
a press fit and there will be resistance
(See Fig 6). Continue to support the
front of the slide.
NOTE: Do not let it fall as it may
damage the rear strap assembly.
STEP 7
Regular wood screw attachment:
Attach each side mounting bracket to
the inside of the cabinet using (3) #6 x
5/8" flat head screws. Put the brackets
flush with the edge of the cabinet
(See Figure 7.1).
32mm system holes: If the system
holes are available, attach the side
mounting bracket to the inside of the
cabinet using the (6) M6.3 x 14mm Euro
screws into the 32mm system holes.
The side mounting brackets should still
be flush with the edge of the cabinet
(See Figure 7.2).
The (3) #6 x 5/8" screws can also be
used for attaching the side mounting
brackets, but are not necessary if the
32mm system holes are used.
#2
PH
STEP 8
Re-engage the unit into each of the
cabinet members, making sure that the
slides are aligned properly (See Figure
8). Once engaged, cycle the unit a few
times to ensure the slides are operating
properly.
STEP 9
Re-install the gas spring while making
sure that the gas reservoir is attached
to the top stud as shown in Figure 9.
Make sure to install both of the retainer
clips into each of the stud caps.
STEP 10
At this time, proceed to page 8 and
continue your installation.
INSTALLATION INSTRUCTIONS: REV-A-MOTION
FIGURE 6
FIGURE 7.1
FIGURE 7.2
Retainer Clip
®
KIT FOR TOP MOUNT WASTE CONTAINERS
FIGURE 8
RE-ENGAGE UNIT
FIGURE 9
7