Preparations
Preparations
Requirements for
assembly
Screw connec-
tions
Tightening torques, gen-
eral
6
Follow the machine operating manual
In addition to these instructions, follow the machine operating in-
structions.
This prevents false operation and damage.
Before assembly begins, the following requirements must be met:
The machine is on a flat surface and is secured against rolling away
•
The electrical system is deactivated
•
The hydraulic system is deactivated
•
The hydraulic lines are depressurised
•
The air pressure brake is depressurised
The work must be carried out by two persons.
Retightening bolts
After the first hours of operation, all bolts must be checked and
tightened if necessary.
Screw connections might have come loose due to vibrations.
Tighten all screw connections using the information provided in the ta-
ble. If different tightening torques are required, they are specified ac-
cordingly. The minimum quality of the bolts is "8.8".
The table can be found on page 23.