Télécharger Imprimer la page

Kortel Design KARMA III Notice D'utilisation page 45

Publicité

Les langues disponibles

Les langues disponibles

Preparing your harness
Installation of the reserve parachute
WARNING!
The installation of a reserve parachute is not an insignificant
act. It must be carried out rigorously, by qualified personnel. It
is imperative to check the initial installation by a portal
extraction test to validate that no element would interfere
during extraction. This test must be carried out by the pilot
himself, installed in his harness as he would be in flight.
The maintenance and servicing of the reserve parachute must
be carried out according to the recommendations of its
manufacturer.
All KARMA III harnesses are equipped with an integrated
rescue container to carry all types of rescue parachutes. This
container is located at the front of the harness, on the right,
under the pilot's thighs.
The KARMA III has a guide sleeve for guiding the risers from the
container to the connection points located on the shoulders of
the harness.
This sheath is equipped with an explosive zipper, allowing the
risers to be released when the parachute is extracted.
This sheath is on the right side, inside the main pocket which is
itself equipped with an explosive zipper.
1
2
It is recommended to redo a complete installation of the
It is recommended to redo a complete installation of the
reserve parachute in the container once a year (belly or
reserve parachute in the container once a year (belly or
integrated), and to check the good general condition of the
integrated), and to check the good general condition of the
assembly (needles, elastics, velcro, absence of humidity, ...).
assembly (needles, elastics, velcro, absence of humidity, ...).
45
KARMA III
2
4
Velcro sleeve
1
Zipped sheath
2
Shoulder connection loops
3
Kontainer Kockpit
4
3

Publicité

loading