Fronius Rapid Shutdown Box - Duo Instructions D'installation page 19

Masquer les pouces Voir aussi pour Rapid Shutdown Box - Duo:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Optional: Connecting the Grounding to a Ground Lug - Variant 1
1
Optional: Connecting the Grounding to a Ground Lug - Variant 2
1
SnapINverter:
Connecting to an external emergency stop button:
Connecting the
If an external emergency stop is required, it can be installed anywhere in the signal line.
Rapid Shutdown
When the connected emergency stop button is pressed, the Rapid Shutdown is started
Box to an emer-
and the PV field is disconnected from the inverter. As soon as the emergency stop button
gency stop but-
is returned to its original position, the PV field is reconnected.
ton
Requirements for the external emergency stop button:
-
-
Maximum switching load: 30 V DC / 5 mA
Nominal voltage between contacts and housing: 600 V DC
2
2
19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Rapid shutdown box - quattro

Table des Matières