Télécharger Imprimer la page

Bradley SN2013/IR Installation page 6

Publicité

Les langues disponibles

Les langues disponibles

SN2013/IR, SN2033/IR
1
Install Unit
Remove Access panel and with
A
the help of another person, place
unit in position against both walls.
B
Ensure unit is level, shimming fl oor unit if
necessary. Mark the wall anchor locations.
2
Connect Water Supply to Valve Assembly
Connect 1/2" NPT female end of stop/check
A
valves to supply lines. Connect supply hoses
to hot and cold inlets of the Vernatherm TMV.
Do not turn on water until
Step 4 is completed!
6
Rough-in of plumbing lines, wall braces and
electrical box must be completed before unit
can be properly installed.
Water Supply Gang
Valve Assembly
OPTIONAL TEMPERED LINE CONNECTION: Connect 1/2"
B
NPT female end of stop/check valve to supply line. Connect
Tempered line adapter to Gang Valve Assembly as shown.
7-12-2010
C
Red Tube
(to Aerator)
Green Tube
(to Aerator)
Black Tube
(to Aerator)
Vernatherm TMV
Cold Supply Inlet
Hot Supply Inlet
Bradley Corporation • 215-923 Rev. H; EN 10-00-015
Install suitable wall anchors (supplied
by installer) for 3/8" bolts at the marked
locations. Secure unit to wall.
OPTIONAL Tempered Line
Adapter Assembly (S39-685)
Braided
Hose
Stop/Check Valve
Installation
Water Supply Gang
Valve Assembly

Publicité

loading

Ce manuel est également adapté pour:

Sn2033/ir