GB
3.4.3
Assembly of PWI air/ water heat exchange (Installation)
Attaching cut-out for PWI air/water heat exchangers
Requirements
-
All general requirements are fulfilled, see
-
The unit is de-energized.
Required tools and material
-
Saw
-
Use a switch cabinet cutter, if applicable
-
Protective covers
Procedure
▪ Use a protective cover to protect the switch cabinet from chips.
▪ Provide the switch cabinet with cut-out (1). For prescribed dimensions (in mm), see figure Switch cabinet
exterior view cut-out PWI (2).
▪ Deburr the cut edges.
▪ Remove chips and assembly waste from the switch cabinet.
Cut-out (1) has been created.
Operating manual PWS and PWI 6502 T 785408480 © Pfannenberg GmbH
Figure 8 - Switch cabinet exterior view
Cut-out PWI air/water heat exchangers
General assembly requirements
Page 14 / 31