5. CONFIGURATION TEST: Before starting up the equipment, it is wise to check the configuration between the thermostats and the
control centre to make sure the thermostats communicate correctly. The grilles do not yet have to be checked, only the radio
communications.
5.1. Place all thermostats in the corresponding zone and aim the control centre antenna towards the zone where the thermostats are
furthest away. Power the control centre to 230 VAC (Wait approx. 2 min. for the centre to carry out its opening cycle.
Switch on the MASTER thermostat and switch
1
Start the zone thermostats and set to 15ºC,
2
3
If there is no communication after 5 min, the zone leds will flash. In this case, check that the
series number programmed in the thermostat corresponds to that of the KSP control panel. If
4
it is properly configured, change the location of the thermostat in the room or re-aim the
antenna..
6.
START-UP
6.1. Connect the air handling unit (AHU) using the diagram supplied.
6.2. Power the control centre to 230 VAC. The centre will implement the opening cycle. All the grilles will open first and, once the mode
has been detected, they are all closed and work started depending on the temperatures selected in the thermostats..
6.3. Check that all zones work properly in line with the table below:
Switch on the MASTER
1
thermostat and switch to cold at
Start the zone thermostats and
2
set to 15ºC, check, one by one,
that all zone dampers open.
Wait for the AHU to start up and
3
check that cold is produced.
Select 35ºC on each thermostat,
check that the corresponding
4
damper closes and that the
machine stops when the last one
6.4. By-pass adjustment: For it to work correctly, it must be selected according to the average flow of the inner unit and must be installed
on the outlet of the machine to avoid direct discharge from the
fan.
Position the counterweight on the end furthest away from the flap
or the shaft. Move the weight inwards or towards the shaft until
the flap opens and the air speed inside the diffusion element is
equal to or below 4 m/s or, until the passing of air does not product
noise on this part.
The closer the counterweight is to the flap, the greater the by-pass
flow and the further away it is the lesser the by-pass air flow. The
rod and counterweight can be removed if required.
to cold at 15 ºC
check that all zones open
(Green leds activated)
Select 35ºC on each thermostat,
Check that all zones close.
(Red leds activated)
thermostat and switch to heat at
15 ºC
Start the zone thermostats and
set to 35ºC, check, one by one,
that all zone dampers open.
Wait for the AHU to start up and
check that heat is produced.
Select 15ºC on each thermostat,
check that the corresponding
machine stops when the last one
is closed
Switch on the MASTER thermostat and
switch to heat at 35 ºC
Start the zone thermostats and set to 35ºC,
check that all zones open
(Green leds activated)
Select 15ºC on each thermostat,
Check that all zones close.
Switch on the MASTER
35 ºC
damper closes and that the
is closed
(Red leds activated)
SUB-ZONA
Switch the AHU to heating mode.
Start the thermostats and set to
35ºC, check, one by one, that all
zone dampers open. Set to 15ºC
and check that they close.
Switch the AHU to cooling mode.
Start the thermostats and set to
15ºC, check, one by one, that all
zone dampers open. Set to 35ºC
and check that they close.
ENGLISH
V. 03.12