Télécharger Imprimer la page

Waeco AirCon Service Center VAS 6380B Instructions De Montage page 90

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 208
Initial start-up
7.9
Filling up the internal refrigerant container
When the AirConServiceCenter is started for the first time, the internal
refrigerant container must be filled from an external refrigerant tank with
at least 5000 g of refrigerant.
I
NOTE
Note the instructions on the refrigerant vessels.
The current supply quantities are displayed in the standby menu.
There are three different types of refrigerant vessel available:
 Refrigerant bottles without rising pipe:
These refrigerant bottles have one connection.
When filling the AirConServiceCenter, the connection must be on the
bottom (turn the bottle upside down).
 Refrigerant bottles with rising pipe:
These refrigerant bottles have one connection.
When filling the AirConServiceCenter, the connection must be at the
top (place the bottle upright).
 Refrigerant bottles with rising pipe:
These refrigerant bottles have two connections. To top up the
AirConServiceCenter, use the connection marked with L (= liquid).
When filling the AirConServiceCenter, the connection must be at the
top (place the bottle upright).
1. In the basic menu, use the cursor keys  or  to select
"Other selections":
2. Press ENTER to confirm.
3. Use the cursor keys  or  to select "Int.vessel filling":
4. Press ENTER to confirm.
90
S h o r t s e l e c t i o n
F r e e s e l e c t i o n
O t h e r s e l e c t i o n s
E N T E R - O K S T O P - E X I T
I n t . v e s s e l f i l l i n g
F l u s h i n g
R e s e t S c a l e s .
S e r v i c e .
VAS 6380B / VAS 6381B
EN

Publicité

loading

Ce manuel est également adapté pour:

Aircon service center vas 6381b