Télécharger Imprimer la page

Waeco AirCon Service Center VAS 6380B Instructions De Montage page 88

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 208
Initial start-up
7.7
Inserting the containers for oil and UV additive
The current supply quantities are displayed in the standby menu.
1. Open the cover flap (20) on the left side and push the containers into
the snap locks:
– Container for fresh oil (17)
– Container for UV additive (18) and
– Drained oil receptacle (19)
2. Close the cover flap (20).
3. Enter the container size for fresh oil and UV contrast agent (see
chapter "Entering the container size (for VAS6381B only)" on
page 89).
88
VAS 6380B / VAS 6381B
17
18
19
20
EN

Publicité

loading

Ce manuel est également adapté pour:

Aircon service center vas 6381b