Télécharger Imprimer la page

Waeco AirCon Service Center VAS 6380B Instructions De Montage page 107

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 208
VAS 6380B / VAS 6381B
8.8.4
Selecting connections
1. Select the parameters in accordance with the air conditioning system
connections:
– Air conditioning system has a high pressure and a low pressure
connection: Select HP/LP.
– Air conditioning system only has a high pressure connection:
Select HP.
– Air conditioning system only has a low pressure connection:
Select LP.
2. Press ENTER to confirm.
3. Select whether after the filling process a trial run of the air
conditioning unit should be carried out or not.
Press ENTER to confirm.
4. Once all settings have been entered, press ENTER to start the
process.
8.8.5
After ending the air conditioning service
✓ After the air conditioning service has finished, you will be prompted to
disconnect the hoses of the AirConServiceCenter from the vehicle air
conditioning system.
1. Disconnect the service hoses (10) and (11) and press ENTER to
confirm.
✓ The service hoses will now be drained. The device is then ready for
further use.
2. Screw the valve caps of the air conditioning system back on the
connections.
EN
H P / LP P O R T
H P PO R T
L P PO R T
E N T ER - O K S T O P - E X I T
A / C S y s t e m t e s t
a t th e e n d ?
E N T ER - O K S T O P - E X I T
P r o ce s s s t a r t ?
E N T ER - O K S T O P - E X I T
Operation
107

Publicité

loading

Ce manuel est également adapté pour:

Aircon service center vas 6381b