Télécharger Imprimer la page

Waeco AirCon Service Center VAS 6380B Instructions De Montage page 105

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 208
VAS 6380B / VAS 6381B
8.8.1
Recovery phase
1. Enter the preferred settings and press ENTER to confirm.
2. If "Rec/Recycling phase ?" has been selected, enter the preferred
waiting time for the pressure increase (standard is 1 min.) in the fol-
lowing menu and press ENTER to confirm, otherwise continue with
chapter "Vacuum process" on page 105.
I
NOTE
The waiting time ensures that any residual refrigerant vaporises and
can then be extracted. The vaporising residual refrigerant triggers an
increase in pressure.
8.8.2
Vacuum process
1. Enter the preferred settings and press ENTER to confirm.
2. If "Vacuum phase ?" has been selected, enter the preferred vac-
uum time (standard is 20 min.), otherwise continue with chapter "Fill-
ing process" on page 106.
3. Use the cursor key  to enter the vacuum phase time.
4. Press ENTER to confirm both settings.
I
NOTE
The air conditioning system is drained completely by the vacuum pump.
This is used to remove any remaining carrier gases or moisture, and to
prepare the air conditioning system for the filling process.
EN
R e c /R e c y c l i n g
p h a se ?
E N T ER - O K S T O P - E X I T
P r e ss u r e i n c r e a s e
T e s t t i m e
m i n .
E N T ER - O K S T O P - E X I T
V a c uu m p h a s e ?
E N T ER - O K S T O P - E X I T
V a c uu m t i m e
m i n .
L e a k T e s t
m i n .
E N T ER - O K S T O P - E X I T
Yes
No
1
Yes
No
20
4
Operation
105

Publicité

loading

Ce manuel est également adapté pour:

Aircon service center vas 6381b