Télécharger Imprimer la page

Dometic GROUP Waeco CoolAir SP950 Notice De Montage page 42

Masquer les pouces Voir aussi pour Waeco CoolAir SP950:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 49
Installation
You can connect the unit to the battery via the lorry's terminal block or
directly. The terminal block is to be preferred for the connection. Ask your
vehicle manufacturer for the specifications of the terminal block.
➤ Lay the supply line and connect it to the vehicle (red line to plus, black
line to minus).
➤ Plug in the supply line plug into the socket of the air conditioning roof
unit supply line.
➤ To relieve strain on the supply line, secure it with a cable tie, e.g. to
the cab roof.
6.2.6
Installing supply lines to the condenser unit (SP950 only)
Observe the following instructions when installing the supply lines:
 Also observe the installation instructions for the condenser unit.
 The maximum cable length between the evaporator and condenser
unit is 4.20 m (fig. 6, page 6).
 When installing and bending supply lines, avoid narrow radii. Use a
suitable round object as a bending aid. A radius which is too narrow
will buckle the refrigerant line, and the air conditioner will be inoper-
able.
➤ Shorten any supply line which is not needed by bending a curve.
➤ Apply packing compound (fig. 7 1, page 6) to prevent water entering
between the rear wall of the truck and the clip.
NOTE
I
If you wish to avoid damaging the rear wall of the truck (drilling a hole),
you can also apply the clip using a suitable adhesive. Observe the
instructions provided by the adhesive manufacturer.
➤ Fasten the supply lines to the rear wall of the truck using the clips
provided (fig. 7, page 6).
➤ Insert the corrugated piping in the holder provided (fig. 7 2, page 6).
➤ Put the cover on (fig. 7 4, page 6).
42
CoolAir RT880, SP950
EN

Publicité

loading

Ce manuel est également adapté pour:

Waeco coolair rt880