Télécharger Imprimer la page

Dometic GROUP Waeco CoolAir SP950 Notice De Montage page 34

Masquer les pouces Voir aussi pour Waeco CoolAir SP950:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 49
Conventions in this manual
1.1.1
Handling electrical cables
 Use cable ducts to lay cables through walls with sharp edges.
 Do not lay loose or bent cables next to electrically conductive materi-
als (metal).
 Do not pull on the cables.
 Attach and lay the cables in such a manner that they cannot be tripped
over or damaged.
 The electrical power supply may only be connected by a specialist
workshop.
 Fit a fuse of 25 amps to the connection to the vehicle's power supply.
 Never lay power supply lines (battery leads) in the vicinity of signal or
control cables.
2
Conventions in this manual
2.1
General information on the installation manual
This installation manual contains the essential information and instruc-
tions for installing the air conditioning roof unit. The information contained
is orientated towards the company installing the air conditioning roof unit.
The following instructions are intended to help you properly use the
installation manual:
 The installation manual is part of the scope of delivery and should be
stored carefully.
 The installation manual provides you with important information on the
installation of the device and can also be used as a reference material
in the event of repairs.
 The manufacturer assumes no liability for non-observance of this in-
stallation manual. Any claims are excluded in this case.
2.2
Target group
The installation and configuration information in this manual is intended
for qualified installation personnel who are familiar with the guidelines
and safety precautions to be applied during the installation of lorry acces-
sory parts.
34
CoolAir RT880, SP950
EN

Publicité

loading

Ce manuel est également adapté pour:

Waeco coolair rt880