Cutting Pylon To Length - Blatchford Javelin Instructions D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

7 Cutting Pylon to Length

Note: The following instructions assume the use of the male, sliding, rotating pyramid. If an
alternative adaptor is required, this should be taken into account throughout the build process.
Use appropriate health and safety equipment at all times including extraction facilities
1
Cut the pylon 10–15 mm longer than required
and assemble fitting clamp (941255).
3
Tighten fitting clamp bolts to 15 Nm (check each
screw at least twice).
5
Remove socket, place fitting clamp in the vice
and cut blade to length. Fit shoulder screws to
prevent damage to components
2
Cut longer
than
required
5
Fit socket to fitting clamp top housing and
tighten pyramid screws (15 Nm). Refer to
alignment page for initial set up.
4
5
15 Nm
Stand user, carry out dynamic alignment and
walking trials. Adjust height to achieve definitive
length with weight evenly distributed.
6
Drill two 8.1 dia. holes through drill bushes.
6
4
15 Nm
938306S/3-0120

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Jav22l1sJav30r9sJav22l1sdJav30r9sd

Table des Matières