Télécharger Imprimer la page

Pentair FRESHPOINT GRO-350B Manuel D'installation Et D'utilisation page 11

Masquer les pouces Voir aussi pour FRESHPOINT GRO-350B:

Publicité

Les langues disponibles

Les langues disponibles

OPTIONAL INSTALLATION
Connecting your Reverse Osmosis System to Refrigerator Icemaker / Water Dispenser
If you are connecting this unit to your refrigerator/icemaker with initial RO installation, wait to turn on the icemaker
CAUTION:
OPTIONAL INSTALLATION
until the post-polishing filter has been flushed according to Step 11.
Connecting your Reverse Osmosis System to Refrigerator Icemaker / Water Dispenser
Use plastic tubing and fittings. Do not use copper tubing or brass fittings.
CAUTION:
If you are connecting this unit to your refrigerator/icemaker with initial RO installation, wait to turn on the icemaker
NOTE: For optimum performance, it is recommended that the distance between the RO system and the refrigerator icemaker/water
CAUTION:
until the post-polishing filter has been flushed according to Step 11.
dispenser be no greater than 10 feet (3 m). At distances greater than 10 feet, the water pressure from the system may not be
Use plastic tubing and fittings. Do not use copper tubing or brass fittings.
adequate to deliver water to the refrigerator.
CAUTION:
NOTE: For optimum performance, it is recommended that the distance between the RO system and the refrigerator icemaker/water
MATERIALS REQUIRED(available from your local hardware store):
dispenser be no greater than 10 feet (3 m). At distances greater than 10 feet, the water pressure from the system may not be
• 3/8" x 3/8" x 3/8" (0.952 mm x 0.952 mm x 0.952 mm) compression or quick-connect tee
adequate to deliver water to the refrigerator.
• 10 feet (3 m) of 3/8" (0.952 mm) polyethylene tubing
MATERIALS REQUIRED(available from your local hardware store):
• Shut-off valve
• 3/8" x 3/8" x 3/8" (0.952 mm x 0.952 mm x 0.952 mm) compression or quick-connect tee
1. Turn off refrigerator water supply and icemaker (consult manufacturer's guidelines).
• 10 feet (3 m) of 3/8" (0.952 mm) polyethylene tubing
2. Close tank valve (on top of storage tank).
• Shut-off valve
3. Turn off water to RO system at the cold water supply, or at the feed water supply adapter.
1. Turn off refrigerator water supply and icemaker (consult manufacturer's guidelines).
2. Close tank valve (on top of storage tank).
4. Open drinking water faucet to relieve pressure.
3. Turn off water to RO system at the cold water supply, or at the feed water supply adapter.
5. Locate tubing (permeate) leading to your drinking water faucet. Cut and insert the
4. Open drinking water faucet to relieve pressure.
3/8" x 3/8" x 3/8" compression or quick-connect tee into the permeate tubing.
Consult manufacturer's guidelines before installing the supply adapter.
5. Locate tubing (permeate) leading to your drinking water faucet. Cut and insert the
3/8" x 3/8" x 3/8" compression or quick-connect tee into the permeate tubing.
NOTE: When cutting the permeate tubing, you may experience some water leakage.
Consult manufacturer's guidelines before installing the supply adapter.
6. Using a length of 3/8" polyethylene tubing, connect the
NOTE: When cutting the permeate tubing, you may experience some water leakage.
icemaker/dispenser line with the free port on the compression tee.
6. Using a length of 3/8" polyethylene tubing, connect the
7. The shut-off valve should be installed as close to this port of the tee
icemaker/dispenser line with the free port on the compression tee.
as possible. Shut-off valve should be installed in the OFF position
7. The shut-off valve should be installed as close to this port of the tee
Consult manufacturer's guidelines before installing the shut-off valve.
as possible. Shut-off valve should be installed in the OFF position
8. Completely open cold water supply.
Consult manufacturer's guidelines before installing the shut-off valve.
8. Completely open cold water supply.
9. Open tank valve.
9. Open tank valve.
10. Turn off the drinking water faucet.
10. Turn off the drinking water faucet.
11. Turn on water to RO system at cold water supply.
11. Turn on water to RO system at cold water supply.
12. Turn on icemaker and open shut-off valve.
12. Turn on icemaker and open shut-off valve.
Consult manufacturer's instructions.
Consult manufacturer's instructions.
13. Check for leaks and tighten connections if necessary.
13. Check for leaks and tighten connections if necessary.
3
3
2
2
262.634.2386 | greatlakesintl.com
4
4
7
7
5
5
6
6
FRESHPOINT GRO-350B Installation and Operation Manual • 11
FRESHPOINT GRO-350B Installation and Operation Manual • 11
1
1

Publicité

loading