Installation Of Inflow Pipe And Overflow Siphon; Preparation Filter For Installation - Graf MINIMAX-PRO Notice De Montage Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5.6 Installation of inflow pipe and overflow siphon

2
Insert the overflow siphon in the lower seal till block.
Insert the inflow pipe DN100 from outside.

5.7 Preparation filter for installation

Connect the filter body
(contained in filter package 340119).
Fix all junctions with screws (against shift of pipes.
Carat tank
2700 L
[L]
1190 mm
*
(+/- 10 mm)
1
2
L
3
info@graf.info
www.graf.info
5. Installation and assembly
2
1
with a PVC pipe DN 100
3750 L
*
*
1380 mm
1610 mm
L
2
(on site) with the inflow Calming Foot
4800 L
6500 L
*
1890 mm
1
2
3
19 / 38
2
1
8500L
*
*
1790 mm
10000 L
*
1990 mm

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

340093342038340119

Table des Matières