Télécharger Imprimer la page

Allmatic 900SC-400CS Manuel D'emploi page 17

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 22
INSTALLATION
Before starting installation, you should carry out the following checks, as well as making sure the structure is
compliant with current standards. Specifically:
Check that the wall and/or column are in good condition. If they are not, the fastening points will need
to be reinforced.
Make sure that the travel of the shutter is not obstructed in any way. The shutter must not have
friction, the movement in aperture and in closure must be free If stopped in any position it must not
move. During movement it must not slip.
Follow the dimensions, create a solid concrete footing and fix the base plate to the ground immerging
it into the concrete using the bracket clamps and fixing screws (fig.4). If the base already exists use
robust expanding wedges.
Provide one or more pipelines for the laying of electrical cables.
N.B. IT IS NECESSARY TO KNOW THE DIMENSIONS OF THE RATCHET IN ORDER TO CALCULATE
WITH PRECISION THE POSITION OF THE COUNTER-PLATE.
Electrical
pipeline
17
GB
Fig.4

Publicité

loading