Télécharger Imprimer la page

ECOFOREST DUBLIN II Manuel D'installation Et Maintenance page 40

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 51
q
Keyboard and keyboard support.
w
Thermostat connection.
e
Power connection ~230/240V - 50Hz.
r
Power cable.
t
Room probe.
Screw the WiFi antenna to the docking station. This magnet base must be stuck to the back of the boiler. Once
assembled, the unit has to remain in a vertical position.
q
Antenna.
w
Magnet connection base.
Place the magnet connection base with the antenna where appropriate. When possible, avoid the presence of
metal sheets around the antenna as the WiFi signal might be distorted.
WiFi upper view.
5.
CLEANING AND MAINTENANCE.
To ensure the correct operation of your boiler, the following Cleaning and maintenance operations are
necessary at the indicated frequency. The boiler must always be cold.
The deterioration of the boiler parts by a lack of cleaning involves the loss of the two-year warranty offered by
ECOFOREST (see warranty section).
WiFi plan view with no metal objects around.
39
Drawing 11
Drawing 12

Publicité

loading