4.7.
Remove the packaging and the protective plastic.
4.8.
Remove the screws or bolts that fasten the stove to the pallet and remove it.
4.9.
If our model has a plastic protection, it must be removed before starting it.
4.10. Remove exhaust blower protection.
MATERIAL
It will be made of a material
resistant to the aggressive action
of the combustion products, to
condensation and to constant
temperatures of 300 °C. The
material will comply with the local
legislation for its application.
Aluminum, galvanized or iron
pipe.
Insulated double wall pipe.
T with outlet.
Clamp union.
Pipe anchors.
Aluminium belt and silicone of
high temperature (300°C).
Pressure gauge.
Expansion vessel.
Buffer tank.
UNPACKING THE BOILER.
Drawing 3
MATERIALS REQUIRED FOR INSTALLATION
COMPLIANCE
OBLIGATORY
PROHIBITED
OBLIGATORY
RECOMMENDABLE
OBLIGATORY
OBLIGATORY
OBLIGATORY
RECOMMENDABLE
RECOMMENDABLE
OBLIGATORY
RECOMMENDABLE
34
PARTICULARS
• ALL.
• ALL.
• Proximity to flammable materials.
• When crossing a forge or partition.
• Outdoor or brick-built chimney installation.
• Relative ambient humidity ≥ 60%.
• Installation in a public facility.
• Potentially accessible to children or people with
mental, physical or sensory disabilities.
• ALL.
• Install the exhaust spiral and gas outlet pipes,
thereby preventing anyone from disassembling or
moving the stove or pipe without tools.
• Install the pipe, thereby preventing anyone from
disassembling or moving the stove or pipe
without tools.
• If the pipe is not equipped with sealing rings
• To compare the pressure of the circuit with which
the boiler indicates.
• If the stove's expansion tank is not big enough
according to specific calculations.
• Installation of special features such as radiant
floor, areas operated by thermostatic valves,
other stoves working in the same site, etc. The
device must be fitted with a buffer tank for proper
regulation.