Télécharger Imprimer la page

DETAIL K2 MFT4X8G Manuel Du Propriétaire page 8

Publicité

Les langues disponibles

Les langues disponibles

1. Flip the connected front and rear bed assemblies over, so they are upside down.
2. Position drawbar (5L, 5R) to the trailer front bed (26), fitting the bars into the U slots on the front
cross member.
3. Use L latch (37) to go through the U bracket and lock with R clip after then.
4. Use M10 x 30 (36), M12 x 25 (39) to connect the drawbar end to trailer side rails. Do not tighten the
bolts until all bolts in position.
5. Connecting drawbar T plate (3), drawbar coupler base (4) as shown with M10 x 20 (34)
Item N
Description
o.
3
Tow bar T-plate
4
Coupler base
5
Tow bar
34
Hex M10 x 20 bolt & nut (set)
�ig.2
8
8
MFT4X8G man
MFT4X8G man
ASSEMBLY
ASSEMBLY
STEP 2
STEP 2
DRAWBAR ASSEMBLY
Qty.
Item N
36
1
37
1
2
39
12
Description
o.
Hex bolt M10 x 30 & nut (set)
Hitch pin Ø12 x 75 & R clip
(set)
Hex bolt M12 x 25 & nut (set)
Qty.
2
2
2

Publicité

loading