®
ABIMIG
7 Putting out of operation
NOTICE
• When putting the system out of operation, ensure that the procedures for switching off
each of the welding system components are observed.
• As liquid-cooled cable assemblies start to leak when they overheat, the coolant
recirculator should continue running for approx. 5 min. after welding.
1 Wait until the shielding gas post-flow time has passed.
2 Close the shut-off-valve for the gas supply.
3 Switch off the power source.
4 Switch off the coolant recirculator.
8 Maintenance and cleaning
Scheduled maintenance and cleaning are prerequisites for a long service life and trouble-free
operation.
DANGER
Risk of injury due to unexpected start-up
The following instructions must be adhered to throughout all maintenance, servicing,
assembly, disassembly and repair work:
• Switch off the power source.
• Close off the gas supply.
• Close off the coolant supply.
• Disconnect the coolant supply and return hoses.
• Close off the compressed air supply.
• Disconnect all electrical connections.
DANGER
Electric shock
Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation and damage.
• Replace any damaged, deformed or worn parts.
BAL.0402.0 • 2018-08-24
7 Putting out of operation
EN - 17