Télécharger Imprimer la page

Bosch DWB093553 Mode D'emploi Et Notice De Montage page 31

Masquer les pouces Voir aussi pour DWB093553:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 35
The extractor hood is designed to be
mounted on the wall.
During installation, optional accessories may
also require fitting.
Observe the minimum distance between
hob and extractor hood (see "Safety
instructions")!
Avoid damaging the sensitive surfaces!
Preparing the wall
RISK OF INJURY,
DAMAGE TO PROPERTY
Before drilling the holes for the designated
installation location, check for concealed
electrical cables and other lines.
The wall must be level and vertical.
The enclosed screws and wall plugs are
suitable for solid brickwork. Use the
appropriate fixing materials for other wall
structures (e.g. plaster board, porous concrete,
poroton bricks).
Ensure that the wall has adequate load
bearing capacity.
Ensure that the depth of the drilled holes
corresponds with the length of the screws.
Ensure that the wall plugs are secure.
Max. weight in kg: 40
Design subject to modification in line with
technical development.
Installation preparations
1. Mark a centre line on the wall from the
ceiling to the lower edge of the extractor
hood.
2. Using the enclosed template, mark
positions for the screws and, to facilitate
attachment, the contour of the attachment
area. The lower edge of the template
corresponds to the lower edge of the
extractor hood.
3. Drill 2x 8 mm Ø holes for suspension of the
extractor hood and press in wall plugs flush
with the wall.
4. Screw on the brackets for the extractor
hood: hand tight, max. 3 Nm.
Ensure that the washers and brackets are
positioned correctly!
Installation
31

Publicité

loading