PE 2001T
2 COLUMNS ASYMETRIC POST LIFT 400V 4T
2 CARTS SYNCHRONIZATION
Repeat the lifting and lowering operations of the lifting machine several times, to put in traction
the two steel cables. If this does not happen, calibrate the steel wire nut.
Press the «UP» button to make sure that during up and down movements the carts are
synchronized. If they have not been synchronized, proceed with the setting of the steel wire nut.
Turn the nut to adjust the length of
the steel wire to align the two carts
3 LIFT LOAD TEST
it is recommended to test the operation of the electrohydraulic system when it is subject to
maximum load.
IMPORTANT :
Check all oil pipes and joints to ensure there is no oil spill before
any lifting operations.
Use all the available arms to lift the vehicle, using them at their
recommended spot. The center of gravity of the vehicle must
be placed in the center of the arm supports.
Remove any load from the vehicle before performing the test
Ensure the correct load distribution
It is forbidden for personnel to position themselves under the
load during the lifting test. Unplug the power cable if the lift
does not work.
Turn the nut to adjust the length of
the steel wire to align the two carts
Picture 13
41