Télécharger Imprimer la page

Kohler K-T72771 Guide D'installation Et D'entretien page 5

Publicité

Les langues disponibles

Les langues disponibles

2. Adjust the Handle Assembly
Ensure the valve stem adapter is lightly placed over the spline
adapter.
Place the handle assembly over the valve stem adapter.
Turn the handle assembly counterclockwise until the valve is fully
closed. The handle will be in the vertical, 6 o'clock, position.
Remove the handle assembly and set aside.
To adjust for handle alignment:
NOTE: The spline adapter allows fine adjustment of the handle
alignment.
Remove the valve stem adapter.
Reposition the spline adapter.
Reinstall the handle assembly and the valve stem adapter.
Check the alignment. Repeat this procedure until the handle
alignment is satisfactory.
Kohler Co.
Valve
Spline Adapter
Valve Stem Adapter
Handle Assembly
5
1204801-2-A

Publicité

loading