Télécharger Imprimer la page

Dometic PERFECTVIEW M75L AHD Instructions De Montage Et De Service page 14

Masquer les pouces Voir aussi pour PERFECTVIEW M75L AHD:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 34
Installing the LCD monitor
7
Installing the LCD monitor
Tools required (fig. 1, page 2)
7.1
For installation and assembly you will need the following tools:
Measuring ruler (4)
Centre punch (5)
Hammer (6)
Drill head set (7)
Drill (8)
Screwdriver (9)
To establish and test the electrical connection, the following tools are required:
Diode test lamp (1) or voltmeter (2)
Insulating tape (10)
Heat shrinking sleeve
Hot air blower (11)
Crimping tool (12)
Soldering iron (optional) (13)
Solder (optional) (14)
Cable bushing sleeves (optional)
To fasten the cables you may require additional cable binders.
14
M55L AHD, M75L AHD
EN

Publicité

loading

Ce manuel est également adapté pour:

Perfectview m55l ahd