GB
10.1 Preparation
Take the appliance out of the packaging.
Remove all packaging material including polystyrene base, keep them out of childrens
reach. While opening the package, water drops may be seen on plastic bag and port-
hole. This normal phenomenon results from water tests in the factory.
Note: Packaging disposal
Keep all packaging materials out of children´s reach and dispose them in an environmen-
tally friendly manner.
10.2
Noise resuction pads installation instructions
1.
reduction pads.
These are used for reducing noise. (Fig. 10-1)
2. Lay the washing machine down to its side, porthole
pointing upwards, bottom side towards operator.
3.
double-sided adhesive protective film; the noise redu-
ction pads under the washing machine cabinet as sh-
own in Figure 10.1(3),two longer pads in position 1 and
3, two shorter pads in position 2 and 4. Finally set the
machine upright again.
Warm tip:
Noise reduction pad is optional , could help to reduce
noise , please assemble it or not according to your
own demand.
10.3 Dismantle the transportation bolts
The transportation bolts are designed for clamping
anti-vibration components inside the appliance during
transportation to prevent inner damage.
1.
Remove all 4 bolts on the rear side and take out
plastic spacers (Fig. 10-2)(Fig. 10-3).
2.
Fill left holes with blanking plugs (Fig. 10-4)(Fig. 10-5).
noise
pads and remove the
10-Installation
10-1
(1)
2x
2x
(3)
10-2
10-4
(2)
10-3
10-5
25