5.0 fi nishing
WARNING
!
•
Power supply service must be completed prior to fi nishing to avoid reconstruction.
•
Heat vents and air openings cannot be covered in any circumstances.
5.1
front glass removal / installation
note:
It is recommended to have two people remove and install the front glass.
A.
Remove the two screws holding the glass retaining brackets in place (Fig. 5-1). Set the screws aside.
B.
Remove the front glass, placing it face down on a soft, non-abrasive surface (Fig. 5-2).
C.
Reverse these steps to install the front glass.
5.2
crystal ember installation
The front glass must be removed and the appliance must be secured in its fi nal location before the crystal embers
are installed.
A.
Place the ember bed strip in position.
B.
Apply an even layer of small crystals along the media tray and place
the medium crystals in desired location.
C.
Install the front glass.
Repeat on
opposite side.
Fig. 5-1
EN
Fig. 5-2
25
W415-4155 / - / 05.10.23