Télécharger Imprimer la page

Broan BCDA Serie Instructions D'installation page 20

Publicité

Les langues disponibles

Les langues disponibles

1 ] Run house power cable between service panel and hood location. Run the house power
2 ] Hang hood from (4) mounting screws previously installed. Slide hood back towards wall until
3 ] Connect ductwork to hood and use metal foil duct tape to make joints secure and air-tight.
20
Install the Hood (Standard Installation)
cable into the hood through the strain relief previously installed in step 6 on page 12.
mounting screw heads are engaged in narrow end of keyhole slots in top of hood. Tighten
screws securely. Attach power cable to the hood using the strain relief.
DUCTED INSTALLATION ONLY
Make sure the damper assembly (or round duct plate) enters the ductwork and that the
damper opens and closes freely.

Publicité

loading