4-2. Hard-wire Installation
4-2-1. ECB series provides the flexibility of hard-wire connection, and this function
will make external control panel wiring easier.
【Version 1】General model
Step 1.
Remove the four screws of AC wiring compartment and pull it out with care.
Step 2.
Pull the line through the snap bushing of the AC wiring compartment cover then
follow below picture operation.
100VAC~120VAC / 200VAC~240VAC System
All manuals and user guides at all-guides.com
Figure 17. General model setting
Figure 18. General model setting
─
Step 1
─
Step 2
Figure 19. General model setting
─
AC wiring
21