20. Lay the bundled lines into the rescue
container in a format that supports the
progression of deployment.
22. Connect the rescue and Y-bridle
(supplied by harness manufacturer) by
looping (larks foot). The connection must
be centered in the field of the protection
fabric (red).
All manuals and user guides at all-guides.com
21. Close the 4 leaves of the rescue
container with the last 50cm of lines.
0