Only install an unpressurised tap.
9.3
9.3.1
Route the connections to the second tap on site, for
example in a 10 mm copper pipe.
Information regarding plastic pipework systems:
!
9.3.2
» Install the diaphragm safety valve in the cold water
supply line; see chapter „Installation / Installation
location".
» Observe the information in the installation instruc-
tions of the diaphragm safety valve.
9.3.3
» Mark out the holes to be drilled in accordance with
tion / Dimensions and connections".
» Drill both holes and then insert rawl plugs.
» Screw in both screw hooks.
9.3.4
» Hang the appliance onto the screw hooks.
» Secure the water connections from the tap to the
appliance.
9.3.5
and tap noise can be adhered to. In addition there will be
a minor mixing effect and consequently the stored hot
»
supply to the appliance.
All manuals and user guides at all-guides.com
-
-
-
Installation - for contractors
»
tap description).
9.3.6
»
»
»
!
10.
!
» Open the hot water tap or set the mono-lever mixer
bubbles.
»
safety valve. When purging, ensure that a full jet of
» Insert the plug into the socket.
» Select a temperature.
11.
use
» Isolate the appliance from the power supply by un-
plugging it.
» Drain the appliance; see chapter „Maintenance /
Draining the appliance".
-
-
-
-
-
check the diaphragm
13