Télécharger Imprimer la page

Enerpac PC-11 Manuel D'instructions page 3

Publicité

Les langues disponibles

Les langues disponibles

Note: Be sure that torsion spring (kit item 5) is positioned
as shown in Figure E. The small spring hook must face
the pump link when the subassembly is installed in the
next step.
3. From the filler plug side of the pump, insert the beam
capscrew (kit item 4) through the opening in the beam.
Then, slide the capscrew through the hole in the pump
link and through the opening on the other side of the
beam. See Figure F.
5
Figure F
Note: Large hook of torsion spring (kit item 5) must
be positioned above the beam. Small hook must be
positioned behind the pump link.
4. Install locking hex nut (kit item 6) to secure the beam
capscrew (kit item 4). See Figure G.
Figure G
Large Hook
Beam
4
Pump Link
Small Hook
6
4
5. Raise the pump handle to maximum stroke. Using a
small pry bar, position the large hook of the torsion spring
(kit item 5) under the beam. See Figure H.
Figure H
6.0 RELEASE VALVE FOOT LEVER INSTALLATION
1. Loosen and remove set screw. Unscrew and remove
knob. See Figure I.
Note: If the knob does not turn freely, a pliers can be used
to unscrew and remove the knob.
Figure I
2. Unscrew the spindle holder. Remove the spindle
holder and spindle as an assembly. Ball will drop out
after assembly is removed. See Figure J.
Note: All parts removed in step 2 should be discarded.
They will be replaced with new parts.
Ball
Figure J
3
5
Knob
(remove)
Set
Screw
(remove)
Spindle
Holder
Spindle
(Remove
old parts)

Publicité

loading